Penang Second Bridge
Transport Road Case Study
Penang Second Bridge
Marine Bridge Street Lighting, Toll Collection System, Traffic Control & Surveillance System
Jambatan Kedua Sdn Bhd
Penang, Malaysia
2014
A remarkable example of engineering excellence, which exemplifies our unwavering commitment to delivering exceptional infrastructure solutions.
Our team of experts in engineering design, construction supervision, testing, and commissioning played a crucial role in the successful completion of this landmark project.
We meticulously designed and implemented a comprehensive traffic control and surveillance system, including CCTV cameras, variable message signs, vehicle incident detection systems, emergency telephone systems, dynamic road signs, and a centralized traffic management system. This advanced system enabled seamless traffic flow, enhanced safety, and real-time incident detection and management, transforming the bridge into a paragon of efficiency and safety.
To further enhance the user experience, we seamlessly integrated manual and electronic toll collection systems, eliminating traffic congestion and streamlining the payment process- demonstrating our commitment to innovation and customer-centric design.
The Penang Second Bridge project exemplifies our focus on precision, innovation, and collaboration. We forged strong relationships with partners including China Harbour Engineering Co Ltd (CHEC) and UEM Builders Sdn Bhd, to ensure seamless interface installations, showcasing our ability to effectively manage complex projects and navigate diverse stakeholder relationships.
Eagles Engineers is proud to have contributed to Malaysia's infrastructure program, delivering the longest bridge in the country and the second-longest in Southeast Asia. This engineering marvel has significantly enhanced connectivity between Penang Island and mainland Peninsular Malaysia, stimulating economic growth, improving transportation efficiency, and positively impacting the lives of communities across the region.